Completed are the single story link building between the main house and existing garage, new floors in the garage before its conversion into a kitchen, conversion of an outbuilding into a dry, usable space as well as various alterations and new apertures added to the existing buildings.
We will be returning later in the year to carry out further works including the full renovation of the house including creating new rooms and doorways, the fitting of a new kitchen and repointing of the exiting buildings. Outside we will be relaying the driveway, landscaping work at the rear of the house (using reclaimed paving and cobbles) as well as the building of a new boundary wall.
Thanks as ever to our team of first class partners and sub-contractors:
- Slater and Myles Roofing
- Phennex Heating Solutions
- Project Electrical
- ACL Damp Proofing
- Derbyshire’s Handyman
- D and M Creations
- Matlock Walling
- Kastone Supplies
- R. Gratton Joinery
- K. Rose Plastering
- W. Caudwell Tiling









